Check what fits your mall unit, decide which zones to price and agree who will handle the fit-out, equipment installation and handover.
Start with the lease boundary. Mark the space the mall and the operator need for circulation, check-in, waiting and viewing. Then test how many usable areas remain and whether staff can see each one.
Take into layout review A marked plan, zone-level clear heights and a list of what still needs confirmation from the mall, operator or local design team.
Choose the base layout you can operate at your busiest time. Price that scope first, then ask for separate lines for attractions you may add or defer.
Check clearance and a separate waiting point for a dunk lane. For dodgeball, plan group entry and changeovers while the main court stays open.
Ask the supplier to mark approach, landing and return areas on the plan. Check where the return path meets the queue and other guest routes.
Ask for the support or fixing interface, any power needs and maintenance access. Keep the option separate in the quote until the local team can review those requirements.
Use these projects to test three decisions on your own plan: whether to split by age, how many activities to specify and where soft play fits.
Shopping center example
HarborLand operates the venue on the mall's sixth floor and describes separate trampoline areas for younger and older children.
See the operator's venue guide →Mark the two court entries and the space needed for each group to wait. Check where caregivers can see the younger area and whether either group has to cross the other queue to reach its gate. Resolve that routing before asking for a price on a second court.
Vasia built project
The 400 m² venue included open jumping, dodgeball, basketball and a dedicated children's zone. Use the zone list as a reference for the equipment schedule. Price the activities individually so you can defer a group court if its waiting area or supervision plan does not fit.
See the Lebanon Project →
Vasia built project
The family venue spans more than 1,500 m² and includes both trampolines and indoor play. For a similar mix, draw both activity footprints on the same plan. Mark the check-in point, the entrance to each area and where caregivers can wait while siblings use separate zones.
See the Melbourne Project →Compare quotes against the same drawing revision and equipment list. Ask each supplier to state what's included, what's optional and what the mall or local contractor must handle.
| Work item | What to confirm | Who to coordinate with |
|---|---|---|
| Layout and drawings | In the quoteDrawing revision, equipment footprint, installation drawings and support or fixing information. Agree how revisions affect the quote. | Confirm withSupplier for equipment drawings. Local design team for building interfaces. |
| Equipment list | In the quoteZone names, equipment references and quantities. Identify the protection, accessories, optional attractions and starting spares included for each zone. | Confirm withSupplier to itemize. Operator to confirm base and optional scope. |
| Freight and access | In the quoteNamed delivery point, who handles customs and taxes, largest package size and weight, dock bookings, unloading and transport to the unit. | Confirm withFreight partner, mall loading team and local contractor. |
| Equipment assembly | In the quoteSeparate crew, supervision, tools, lifting and travel. Record who checks the assembly and how defects or shortages are handled. | Confirm withNamed installation lead and the supplier for its contracted work. |
| Mall fit-out and approvals | In the quoteFloor readiness, structure and fixings, power, services, fire and exit interfaces. List the landlord and local approvals with the person responsible for each. | Confirm withLandlord, local design professionals and tenant fit-out contractor. |
| Handover and upkeep | In the quoteApplicable equipment documents, inspection or acceptance records, maintenance information and warranties. Name who closes outstanding items and receives the records. | Confirm withNamed acceptance lead, applicable inspector and operator. |
Yes. Send the dimensioned lease plan with the columns, tenant entry and known exits marked. Include photos and any section drawings showing services above the proposed courts. Identify which dimensions came from the landlord's plan and which were measured on site.
Send the latest revision and mark what moved. A relocated duct may affect one zone, while a revised exit route can change several zones and queues. Ask for an updated layout and a list of affected equipment, work and quote lines before approving the change.
Ask for opening spares by zone and equipment reference, such as the mats and pads for the selected court. Separate the stock you want onsite from parts you can reorder. Confirm compatibility, reorder lead times and who supplies replacements under the agreed support terms.
Tell us which decision is next: checking a unit, choosing which zones to price or confirming installation scope. If you already have an equipment list, send it with the drawing revision so we can discuss the same scope.